生物接触氧化人工湿地组合工艺中水处理回用景观水体效能试验

发布于:2021-06-18 12:31:03

第31卷第6期 2009年12月

土木建筑与环境工程
Journal of Civil,Architectural&Environmental Engineering

v01.31 No.6 Dec.2009

生物接触氧化一人工湿地组合工艺中 水处理回用景观水体效能试验
胡学斌,柴宏祥,彭述娟,龙腾锐
(重庆大学三峡库区生态环境教育部重点实验室,重庆400045)



要:绿色建筑中水处理系统中,优质杂排水采用0.72 kgBOD。?m_3?d_1的常规负荷(生物)接触

氧化池预处理后,再采用人工湿地进行后处理。试验结果表明,影响该组合工艺出水水质达标的限 制性指标为总氮(TN)。为使处理出水达到景观水回用标准,人工湿地的最大水力负荷分别为夏季
(30~36℃)o.50 m?d~、冬季(8~12℃)o.33 m?d~,夏季与冬季的最大水力负荷比为3:2。研

究结果结合绿色建筑不同季节的中水用水量需求,可以确定绿色建筑“(生物)接触氧化+人工湿 地”组合工艺处理优质杂排水回用于景观用水的处理规模,指导该组合工艺的设计、运营以及预测
处理效果。

关键词:水处理;绿色建筑;生物接触氧化;人工湿地;中水;景观回用水 中图分类号:TU823.6 文献标志码:A 文章编号:1674—4764(2009)06-0112-05

Performance of Drainage Reuse

as

Waterscape Treated by Combinational

Technique of Biologic Contact Oxidation and Constructed
HU Xue-bin,CHAI Hong-xiang,PENG Shu-juan,LONG Teng-rui
(Key Laboratory of the Three Gorges Chongqing,400045,P.R.China) Reservoir Region’S

Wetland

Eco-Environment,Ministry of Education,Chongqing University,

Abstract:The high grade gray water was pre-treated by biologic contact oxidation

on

load of 0.72 KgBOD5

?m一3?d~,and then post—treated by constructed wetland.On the basis of experiment,it was found that: Totle nitrogen(TN)was the restrictive index of the combinational technique.To meet the reclaimed water quality standard and
reuse

for waterscape,the peak hydraulic load of constructed wetland was 0.50 m?d一1

in summer(30~36℃),and 0.33 m?d叫in winter(8~12℃).And the load ratio of the peak hydraulic under the summer and winter conditions
seasons

was

3:2.With

the

experimental results
can

and

reclaimed

water

quantity requirements in different

of buildings,treatment scale
contact

be determined.

Key words:water treatment;green building;biologic for waterscape

oxidation;wetlands;reclaimed water;reuse

按照《绿色建筑评价标准》(GB/T

50378—2006)

绿色建筑(小区)景观水体富营养化,对中水的氮磷 指标进行了严格控制,因此一般要求中水处理工艺 具备除磷脱氮能力Ⅲ。 采用人工湿地作为城镇污水处理排水的后续生

要求,绿色建筑应大力提高绿色建筑节水率和非传 统水源利用率。采用中水处理与回用技术措施是通 用的有效措施‘1|,当中水回用于景观水体时,为防止

收稿日期:2009—08—26

基金项目:国家水体污染控制与治理科技重大专项(2008ZX07315--001);国家科技部国际合作项目(2008DFA91770)
作者简介:胡学斌(1964一),男,副教授,博士生,主要从事水污染控制与治理研究,(E-mail)xbhu@cqu.edu.en。

万   方数据

第6期

胡学斌,等:生物接触氧化一人工湿地组合工艺中水处理回用景观水体效能试验 级组合工况进行对比试验。

113

态净化工艺已经开展了多年的研究和实践,再生水 已经广泛回用于市政杂用水、工业用水、农业用水和 城市河道湖泊景观水体等…]。多年研究和工程实 践结果表明‘4。-8]:人工湿地处理工艺采用高水力负 荷、低污染负荷的方式,可以取得较高的处理效能。 采用“接触氧化+人工湿地”组合工艺用于处理水量 小、水质水量变化大的建筑小区污水的研究已有相 关报道,由于人工湿地形式多样且处理效能受地域 影响较大,现有研究报道的组合处理工艺运行负荷 差异较大[9‘11|,而且存在设计规模不合理等现象…]。 该文将充分利用(生物)接触氧化法在城镇污 水、工业废水和微污染水源处理的高效性和成熟 性[1}1引,并结合人工湿地后续生态处理的高效性,特 别是除磷脱氮优势L7J引,以中国西部建筑(小区)的 优质杂排水为研究对象,以中水处理达到《城市污水 再生利用景观环境用水水质》(GB/T
18921—2002)

图1侧向潜流人工湿地试验装置*面图

标准为目标,选择“(生物)接触氧化+侧向潜流人工 湿地”组合工艺,开展中水处理效能试验研究,得出 该工艺的限制性影响因素、工艺优化组合方式和工 艺参数,为该工艺在工程推广应用时的规模优化和 稳定高效运行提供理论依据和科技支撑。

图2侧向潜流人工湿地试验装置剖面图

2)填料:试验采用的人工湿地填料采用小试对 比研究后的重庆大学的专利产品酶促填料。该填料 比表面积大,孔隙率高并有一定机械强度,有利于微 生物的附着和生长繁殖以及微生物代谢过程中所需 氧气和营养物质的传质过程。 3)植物选种:根据小试对比研究结果,试验选用 芦苇、美人蕉、菖蒲、风车草4种植物组合搭配种植。 其中芦苇、美人蕉的种植密度为35株/m2,菖蒲的种 植密度为40株/m2,风车草的种植密度为20株/m2。 1.2试验水质 试验用水采用蕈庆大学B区学生宿舍的生活污 水及雨季收集雨水的混合水,用以模拟优质杂排水。 校区生活污水水质受到学生活动规律的影响,进水 水质变化较大,当生活污水进水浓度明显偏高时。采 用增加雨水量比例的方法,使试验水质保持相对稳 定的浓度。中水处理试验水质如表1所示。
表1试验用水水质
COD/ BOD5/

1试验装置与方法
1.1试验装置
1.1.1

生物接触氧化预处理试验装置1)构造与尺

寸:生物接触氧化预处理试验装置采用常规池型。由 池体、填料、支架、布气系统、进出水装置及管道附件 等部分组成。试验采用的生物接触氧化池外形尺寸 为0.75
inX0.66 m×1.80

1TI,有效容积为0.65

in3。

2)填料:经过小试对比研究后选择组合式填料,该填 料由高分子聚合物(塑料片)和醛化维纶长丝组成, 并加紧纺纤维绳固定连接。该填料的表面积被充分 利用且不会粘结,使老生物膜易脱落和新生物膜的 产生,具有比表面积大、易挂膜、使用方便、更换简 单、充氧性能好、使用寿命长、安装方便快捷等优点。 1.1.2侧向潜流人工湿地试验装置 1)构造与尺 寸:侧向潜流人工湿地试验装置内设置*行交错的 导流墙,将湿地床内空间分隔成S形的水流廊道,沿 廊道水流方向底坡为1%[1 7|。由于试验场地限制, 人工湿*矫娌贾贸芍苯翘菪危*面布置和具体 尺寸如图l和图2所示。 人工湿地试验装置按3级设计,每1级侧向湿 地床S形的水流廊道宽为0.4 m,有效面积为
2.5 ITl2,高为1.0

总氮/

氨氮/

总磷/

(mg.L-1)(mg.L’1)(mg.L。1)(mg.1。一1)(mg.I.-1)pH

1.3试验方法 试验设计了6组组合工艺工况,考察“(生物)接 触氧化+人工湿地”组合工艺分别在夏季和冬季条 件下,不同水力条件对人工湿地处理常规生物接触 氧化池出水的综合影响。每组试验分别在夏季即植 物生长季节(4月~10月)或冬季即植物枯败季节 (11月~次年3月)稳定运行26~32 d。为合理确

1TI,容积为2.5 m3。试验时可以根

据设计的负荷,分别选择l级、1、2级组合或1、2、3

万   方数据

114

土木建筑与环境工程

第31卷

定组合工况的最大效能和限制性影响因素,试验选
高负荷 巾负荷 低负荷l高负荷 中负荷 低负荷

择旱季(非下雨日)的实验数据进行分析研究。组合 工艺的具体运行工况条件如表2所示。
表2接触氧化+人工湿地组合工艺处理中水运行条件 接触氧化池
工况
7 j

2.5 2.0

£I.5








kTP达标绒

≈勉 锄 跳
【1.0。g,《.河道类{ i…j甄r…
个p括^;蛙一

暑I.0 人工湿地
7 h
(. d m ) 0.5
00

温度/℃

(鬻鬻鬈一,气水比HRhT7弯妻负d-夏ikgB(m

)I)5? 瓤

o~

‘l气_?

~一..f、气r~、l F~

:一



3?一) d I

””“

~ ¨

图4不同工况条件下组合工艺对总磷的去除情况

剐6

由图可知,优质杂排水经生物接触氧化池处理 后,出水TP随温度升高而降低,温度在8~36℃变




化时,TP=1.36—1.53 mg/L,生物接触氧化对TP


去除效果不明显;出水再经人工湿地处理后,TP去 除效果明显,超过70%由人工湿地去除,而且各运 行工况间出水TP波动较小,在0.2~0.4 mg/L之 间变化。该组合工艺分别在夏季和冬季的6种水力 条件下运行,人工湿地出水TP稳定达标而且离回 用水标准控制值差距较大,可见,人工湿地对生物接 触氧化池出水进行处理,通过湿地基质吸附、湿地植 物吸收及微生物强化除磷等综合作用,显示出了人工 湿地对TP的高效去除能力,解决了常规中水处理工 艺TP去除效率低影响中水回用于景观水体的瓶颈。 因此,TP也不是影响中水出水达标的限制性因素。 2.3氨氮处理效能 人工湿地处理生物接触氧化池出水的6组工况 条件下,氨氮随运行时间的去除变化如图5所示。
+进水
商负荷 +接触氧化池出水+人丁湿地出水 夏季 1医负倚 冬季 高负荷
冬季 冬季

1.4测定项目与方法 定期测试出水的COD、BOD。、总氮、氨氮、总磷 及pH值等皆用国家标准方法进行分析测试。

2试验结果及分析
2.1有机物(BOD。)处理效能 人工湿地处理生物接触氧化池出水的6组工况 条件下,BODs随运行时间的去除变化如图3所示。 由图可知,优质杂排水经生物接触氧化池处理 后,出水BODs随温度升高而降低,温度在8~36℃ 变化时,BODs一1l一23 mg/L;出水再经人工湿地 处理后,BOD。去除效果明显,而且各运行工况间 BODs相差较小,在3~7 mg/L之间波动。该组合 工艺分别在夏季和冬季的6种水力条件下运行,人 工湿地出水BOD。稳定达标,因此,人工湿地对生物 接触氧化池出水的BOD。去除具有较高的效能, BODs不是影响中水出水达标的限制性因素。
星李 星亭 巾负荷 显李 冬季 冬季 中负荷 冬季 低负衙

夏熏

” ∞






M Ⅳ HV ~
氰铜 达标线(5
mg/L) ——、.H

中负荷

是季

中负荷

低贾荷

Ⅳ\,



m0
一I-,1.竽c一、哥)i鼍
, 0

/ 雨i—瞄~

。:I?I目譬~

惫东~

鱼b●●?L

。F

_■-_
H,●_^





离负荷 —√”

低负衙

高负荷

A ~~
BOD,达 标线(10” 观t f性河道类
, g/L.

.'^^
BOD。达标l 其


E(6mg,L 盹) 一、^,

图5不同工况条件下组合工艺对氨氮的去除情况

由图可知,优质杂排水经生物接触氧化池处理

(1_1.竽E一、t盎e∞

帅加∞蛐柏∞加m


o?_!~。
-.1Hr■●■■●“‘

●‘●●●一

.Cq*H/


.。●●●●■●‘

后,出水氨氮随温度升高而降低,温度在8~36℃变 化时,氨氮从进水的20 mg/L左右降低到4 mg/L 左右,去除了约80%,表明接触氧化池对氨氮的硝 化作用明显;出水再经人工湿地处理后,氨氮进一步 降低,但去除量有限,人工湿地对进水氨氮的去除贡 献率不足15%。进水经过生物接触氧化和人工湿 地组合工艺处理后,出水氨氮浓度值较低,在1.9~
4.2

图3不同工况条件下组合工艺对BODs的去除情况
2.2

总磷(TP)处理效能 人工湿地处理生物接触氧化池出水的6组工况

条件下,出水TP随运行时间的变化如图4所示。

mg/L之间小幅度波动。该组合工艺在夏季和 冬季6种水力条件下运行,人工湿地出水氨氮稳定

万   方数据

第6期

胡学斌,等:生物接触氧化一人工湿地组合工艺中水处理回用景观水体效能试验 L,人工湿地的水力负荷为0.33
m?d~。

115

达标,因此,氨氮也不是影响中水出水达标的限制性 因素。
2.4

因此,当“接触氧化+人工湿地”组合工艺处理 中水回用于景观用水时,为使夏冬季条件下,出水均 能达到《景观水回用标准》,其组合工艺的夏冬季运 行负荷比为3:2,结合绿色建筑夏冬季时的不同中 水用水量需求,可以指导该组合工艺的处理规模与 优化运行调控,预测工艺出水水质。 3

总氮(TN)处理效能 人工湿地处理生物接触氧化池出水的6组工况

条件下,总氮随运行时间的去除变化如图6所示。
+进水 商缸荷 中负荷 t接触氧化池出水--a-人T湿地出水 低负荷 高负荷 ’I^.^ 中负荷

。气~

。廿
和ti气一

瞩 ≈
■0


一-。。- }线‘15“J

低负荷

V‘_-
~^^

卜~ ^卜 :,—-、.
9 3





∥ o≥ \TN选橱
l 5 9 13 l 5 9 131 5 9 13

1)采用“生物接触氧化+人工湿地”组合工艺处 理优质杂排水,对BOD。、氨氮、总磷和总氮都有明 显的去除效果,当优质杂排水经过常规负荷0.72
kg

J 5 9

13







13I 5

BOD。/m3?d的接触氧化预处理后再进行人工湿地 后处理时,人工湿地最大水力负荷夏季(30~36℃)
为0.50 m?d~、冬季(8~12℃)为0.33 m?d-1时,

f/fl

图6不同工况条件下组合工艺对总氮的去除情况

由图可知,接触氧化池生物出水TN一15~22 mg/L,人工湿地出水TN一8~18 mg/L,其中夏季 (30~36℃)的3种负荷工况条件下,出水TN在
8.7~12.4 mg/L之间波动,均可以达到景观水回用

出水可以稳定达到《景观回用水水质标准》。 2)影响“生物接触氧化+人工湿地”组合工艺处 理优质杂排水出水水质达标的限制性指标为TN。 当优质杂排水经过常规负荷的接触氧化预处理后, 人工湿地后处理夏季与冬季的最大水力负荷比为 3:2,结合绿色建筑不同季节的中水用水量*衡分 析,可以合理确定该组合工艺的中水处理规模,有效 指导该组合工艺的优化运行调控并预测出水水质。 参考文献:
[1]柴宏祥.绿色建筑节水技术体系与全生命周期综合效 益研究[D].重庆:重庆大学城市建设与环境工程学院,
2008.

标准,在冬季(8~12℃)的2个低负荷的工况时,出 水TN在10.1~14.6 mg/L之间波动,可以达到景 观水回用标准,而当人工湿地负荷达到高负荷(O.50 m?d-1)时,出水*均TN一18.2 mg/L,超过了《景 观回用水标准》15 mg/L的控制值。可见,该组合工 艺在设计的6种水力运行条件下,TN是影响出水 的限制性因素之一。 由图5和图6可知,生物接触氧化*鸬搅私 强的好氧硝化作用,同时也有少部分的TN在接触 氧化池的生物膜微环境中通过同时硝化反硝化去 除,但生物接触氧化池中TN去除率不足20%,TN 主要在人工湿地中降解。当人工湿地在夏季较高温 度条件且在一定负荷条件下,如试验中达标的5种 工况,人工湿地通过植物摄取、基质吸附和硝化/反 硝化等作用进一步去除TN使之达标。但是当人工 湿地在冬季低温条件下运行且负荷过大,如试验中 未达标的这种工况,则因低温下TN的各种去除作 用均显著下降使得出水TN超标。 2.5试验结果工程化应用讨论 由以上试验结果可知,影响“生物接触氧化+人 工湿地”组合工艺出水达到《景观回用水标准》的限 制性控制指标为TN。 通过试验结果分析,传统接触氧化工艺去除总 氮能力较低,但好氧硝化效果较佳,可达到80%以 上。生物接触氧化池出水经过人工湿地后,TN可 以较大幅度降低,由图6可知,夏季时,为使中水出 水TN低于15 mg/L,人工湿地的最优水力负荷为 0.5 m?d'。,冬季时,为使中水出水TN低于15 mg/

[2]何强,柴宏祥,张丽.绿色建筑中水处理工艺及设施探
讨EJ].给水排水,2007,33(7):90—92.
HE QIANG,CHAI HoNG-XIANG,GoU HoN(}
on

YING.A discussion pre-treatment of

modification of reclaimed-water

green

building[J].

Water&

Wastewater,2007,33(7):90-92.

[3]MARGARET
secondary subtropical

G.The role of constructed wetlands in treatment arid and water
reuse

effluent and

in

australia[J].

Ecological

Engineering,2005,25(5):501—509.

[4]ROUSSEAU
Constructed

D,LESAGE wetlands for

E,STORY water

A,et

a1.

reclamation[J].

Desalination,2008(1-3),218:181—189.

[5]LI

LIN—FENG,LI of

YING-HAO,DILIP wetlands in

K,et

a1. the

Potential

constructed

treating

eutrophic water:evidence from taihu lake of

China[J].

Bioresource Technology,2008,99(6):1656-1663.

[6]LAURA



KANAGY,BRENDA



JOHNSON,

JAMES W CASTLE,et a1.Design and performance of


pilot—scale constructed wetland
gas storage

treatment system for

natural

produced

water[J].Bioresource

Technology,2008,99(6):1877—1885.

万   方数据

116

土木建筑与环境工程
microcystins by permanganate:Reaction

第31卷

[7]李晓东。孙铁珩,李海波,等,人工湿地除磷研究进展 EJ].生态学报,2007,27(3):1226—1232.
LI XIA0一D()NG,SUN a1.Current removal in researches constructed TIE—HENG,LI HAI—B(),et and
prospects

kinetics

and

implications for water treatment EJ 2007,41(1):102—110.

3.Water

Research.

of

phosphorus Ecologies

[143 KEMAL
filtration

G。BILAL and

T.A

serially

connected for

sand small

wetland[J].Acta

constructed

wetland

system

Sinica,2007,27(3):1226—1232.

community N,et a1.An

wastewater

treatment[J].

Ecological

[8]CHRISTOS
BOD and



AKRATOS,JOHN

Engineering,2009,35(8):1208—1215.

artificial neural network model and design equations for COD flow removal prediction in horizontal

E153李璐。温东辉,张辉,等.分段进水生物接触氧化工艺 处理河道污水的试验研究EJ].环境科学,2008,29(8):
2227—2234. LI

subsurface

constructed

wetlands[J].Chemical

Engineering

Journal,2008,143(1—3):96—110.
use

LU,WEN DON(}HUI。ZHANG HUI,et a1.Pilot
on

[9]VYMAZAI。J.The 口].Ecological

constructed

wetlands

with experiment

the treatment of the river wastewater by
contact

horizontal sub-surface flow for various

types

of wastewater


step-feed biological

process[J].Environ-

Engineering,2009,35(1):卜17. a1.Subsurface-flow

mental Science,2008。29(8):2227-2234.

[103 JAUME P。JOSE v,JUAN J,et

constructed wetlands in Spain for the sanitation of small communities:A comparative

E163

CHRISTOS VASSILOS

S A

AKATOS,JOHN N PAPASPYROS,
TSIHRINTZIS.Total in nitrogen and

study[J].Ecological
ammonia

Engineering,2007,30(4):312—319.

removal prediction

horizontal of

subsurface neural

[11]GRoSS A,SHMUELI

O,RONEN

Z,et

a1.Water

flow

constructed

wetlands:Use


artificial

recycled vertical flow constructed


wetland(RVFCW)一

networks and

development of

design

equation[J].

novel method

of recycling greywater for irrigation in

Bioresource Technology,2009,100(2):586—596.

small communities and 2007,66(5):916-923.

households[J].Chemosphere,

[17]翟俊,何强,肖海文,等.折流湿地滤池+侧向潜流湿地
床污水处理系统装置及方法:中国,200510057047.2

[12-]北京市城市节约用水办公室.中水工程实例及评析 [M].北京:中国建筑工业出版社,2003.
EVA

[P].2005—04—28. (编辑王秀玲)

o●o-o…‘㈣o删c…o蝴o…—o删o…o…o…o…o…o…o●o●‘H’“
[133
R,MARIA E MAJAD【),et a1.Oxidation of

(上接第111页)
[9]陈庆峰,单保庆.生态混凝土在城市面源污染控制中的 应用初探EJ].上海环境科学,2005,25(4):214—217.
CHEN Advanced oxidation and adsorption technologies for
as

organic micro-pollutant removal from lake water used drinking—water 4307-4318.

QING—FENG,
eco-concrete

SHAN

BAO-Q1NG.

An
source

supply[J].Water

Research.2002,36:

application of pollution

for urban non-point

controlEJl.Shanghai

Environmental Science,

[143国家环境保护总局.水和废水检测分析方法EM].4版.
北京:中国环境科学出版社,2002.

2005,25(4):214-217.

1-103李化建,孙恒虎,肖雪军.生态混凝土研究进展EJ].材
料导报,2005。19(3):17—21.
Ll HUA一儿AN,SUN HEN(}HU,XIAo in research
off

r15]VEDAT
of

U,KADIR

O,ISMAIL T.Seasonal variations
precursors

disinfection

by-product

profile

and

their

XUEHUN.

removal through surface water treatment

plants[J3.Science

Advance

eco-concrete[J].Materials

of the Total Environment,2008,390:1417-1424.

Review,2005,19(3):17-21.

[16]CHEN
seven

C,ZHANG x kinds of

J,HE W J,et a1.Comparison of
water treatment removal:A processes
to

[113吴义锋,吕锡武,王新刚,等.4种生态混凝土护坡护砌 方式的生态特性研究[J].安全与环境工程,2007,13
(1):9-12.

drinking material

enhance organic

pilot

test[J].

Science of the Total Environment,2007,382:93一102.

WU YI—FENG。LU XI—WU,WANG XIN—GANG,et
a1.Research
concrete
on

[17]吴义锋.生态混凝土护砌改善微污染水源水质及生态 效应研究[D3.南京:东南大学,2008. [183 KIM
S B A,YAVUZ

ecological
types

properties for

of

four

eeo-

embankment

ecological

slope



C。KIM


on

J.Effect of
contaminant

protectionFJ].Safety
2007,13(1):9—12.

and Environmental Engineering,

dissolved organic matter
transport

and bacteria

in

riverbank

filtration[J].

Journal

of

[123曲久辉.饮用水安全保障技术原理[M].北京:科学出
版社,2007.

Contaminant Hydrology,2003,66:卜23.

[133

GUZZEI.LA

L,

FERETTI

D,

MONARCA

S.

(编辑胡英奎)

万   方数据

生物接触氧化-人工湿地组合工艺中水处理回用景观水体效能 试验
作者: 作者单位: 刊名: 英文刊名: 年,卷(期): 被引用次数: 胡学斌, 柴宏祥, 彭述娟, 龙腾锐, HU Xue-bin, CHAI Hong-xiang, PENG Shu-juan , LONG Teng-rui 重庆大学,三峡库区生态环境教育部重点实验室,重庆,400045 土木建筑与环境工程 JOURNAL OF CHONGQING JIANZHU UNIVERSITY 2009,31(6) 1次

参考文献(17条) 1.LAURA E KANAGY;BRENDA M JOHNSON;JAMES W CASTLE Design and performance of a pilot-scale constructed wetland treatment system for natural gas storage produced water 2008(06) 2.JAUME P;JOSE V;JUAN J Subsurface-flow constructed wetlands in Spain for the sanitation of small communities:A comparative study 2007(04) 3.LI LIN-FENG;LI YING-HAO;DILIP K Potential of constructed wetlands in treating the eutrophic water:evidence from taihu lake of China 2008(06) 4.ROUSSEAU D;LESAGE E;STORY A Constructed wetlands for water reclamation 2008(1-3) 5.VYMAZAL J The use constructed wetlands with horizontal sub-surface flow for various types of wastewater 2009(01) 6.CHRISTOS S AKRATOS;JOHN N An artificial neural network model and design equations for BOD and COD removal prediction in horizontal subsurface flow constructed wetlands 2008(1-3) 7.李晓东;孙铁珩;李海波 人工湿地除磷研究进展[期刊论文]-生态学报 2007(03) 8.MARGARET G The role of constructed wetlands in secondary effluent treatment and water reuse in subtropical and arid australia 2005(05) 9.何强;柴宏祥;张丽 绿色建筑中水处理工艺及设施探讨[期刊论文]-给水排水 2007(07) 10.柴宏祥 绿色建筑节水技术体系与全生命周期综合效益研究 2008 11.KEMAL G;BILAL T A serially connected sand filtration and constructed wetland system for small community wastewater treatment 2009(08) 12.EVA R;MARIA E MAJADO Oxidation of microcystins by permanganate:Reaction kinetics and implications for water treatment 2007(01) 13.北京市城市节约用水办公室 中水工程实例及评析 2003 14.GROSS A;SHMUELI O;RONEN Z Water recycled vertical flow constructed wetland (RVFCW)-a novel method of recycling greywater for irrigation in small communities and households 2007(05) 15.翟俊;何强;肖海文 折流湿地滤池+侧向潜流湿地床污水处理系统装置及方法 2005 16.CHRISTOS S AKATOS;JOHN N PAPASPYROS;VASSILOS A TSIHRINTZIS Total nitrogen and ammonia removal prediction in horizontal subsurface flow constructed wetlands:Use of artificial neural networks and development of a design equation 2009(02) 17.李璐;温东辉;张辉 分段进水生物接触氧化工艺处理河道污水的试验研究[期刊论文]-环境科学 2008(08)

相似文献(10条)

1.期刊论文 刘晓峰.郭斌 关于绿色建筑及绿色建筑节水问题的研究 -科技传播2009(6)
绿色建筑以可持续发展思想为指导,提倡水的循环利用与中水处理.水资源的循环利用使给排水系统的综合利用效率达到最优,加强中水处理既降低能 耗,又做到减少排放.由此建筑给排水在开发过程中需要有自己的技术体系.在这些技术中,建筑节水及水资源利用方面的设计思路与节能减排、资源循环 利用息息相关.绿色建筑要实现节水及水资源的合理利用,给排水设计与建筑设计只有同步发展才可能达到建筑整体节能减排的理想效果.

2.会议论文 刘加根.林波荣.田军 三星级绿色建筑案例介绍-华侨城体育中心 2009
作为首批获得国家绿色建筑标识、全国唯一的改扩建的三星建筑,深圳华侨城体育中心项目通过对围护结构、能源系统、自然通风和采光等方面进 行模拟优化与技术经济分析后,应用了诸如温湿度独立控制、中水处理利用、清水混凝土与旧有建筑建材改造和再利用等大量的节能、节水、节材等人 性化技术,从而达到了项目设计能耗达到《公共建筑节能设计标准》规定能耗的72%;太阳能热水系统提供50%以上的生活热水;非传统水源的利用率 达到36%;40%以上的室外地面为透水地面的高要求指标。

3.期刊论文 柴宏祥.胡学斌.彭述娟.CHAI Hong-xiang.HU Xue-bin.PENG Shu-juan "混凝沉淀-人工湿地"处理绿色 建筑中水正交试验 -土木建筑与环境工程2010,32(4)
采用"混凝沉淀-人工湿地"工艺处理绿色建筑优质杂排水,混凝沉淀预处理的正交试验结果表明,出水BOD5与容积负荷(Nv)、温度(T)、PAC加药量 (ρ)之间符合一次线性回归正交方程:BOD5=2.05 Nv-0.41T-0.82ρ+38.9.人工湿地后处理的正交试验结果表明,出水BOD5与人工湿地面积负荷(NA)、温 度(T)符合一次线性回归正交方程:BOD5=NA-0.32T+12.2.以试验结果的2项回归正交方程为基础,结合绿色建筑不同季节的中水用水量需求,构建了组合工 艺的工程投资经济最优化模型,可用于组合工艺处理绿色建筑优质杂排水回用于市政杂用水的中水处理规模确定,预测中水处理效果,指导该工艺的稳定高 效运行.

4.期刊论文 柴宏祥.何强.苟红英.CHAI Hong-xiang.HE Qiang.GOU Hong-ying 绿色建筑的中水预处理改进工艺 中国给水排水2007,23(16)
根据绿色建筑的理念,在保证中水处理效果的前提下,对绿色建筑的中水预处理工艺进行了改进,取消了格栅和污泥处理两个单元,增设了集泥坑和除 臭排气管,使改进后的调节池具有水质和水量调节、沉砂、初沉、集泥等功能,降低了投资和运行费用,方便了运营管理,减轻了中水处理对周边环境的影 响.

5.学位论文 杨婧 绿色建筑节水与水资源利用系统整合设计研究 2009
随着我国建设资源节约型和环境友好型社会的发展以及建筑节能事业的大力推广,绿色建筑理念正不断深入人心,受到越来越多人的关注。节水与 水资源利用是绿色建筑“四节一环保”中的重要内容之一。针对我国绿色建筑刚刚起步,绿色建筑节水与水资源利用系统的设计缺乏系统性,普通建筑 (小区)设计中各专业各司其职,全局把握绿色建筑节水与水资源利用系统的整体设计能力低等问题,开展了绿色建筑节水与水资源利用系统整合设计研 究,主要研究内容和结论如下:<br>   ①通过研究绿色建筑节水与水资源利用系统整合设计的技术方法,提出了绿色建筑节水与水资源利用系统的整合设计三大要素:资源整合、技术整合和 专业整合。其中技术整合是整个整合设计的核心,主要涉及节水与水资源利用技术与其他专业技术的整合,以及整个节水与水资源利用系统内各子系统 的技术整合。绿色建筑节水与水资源利用整合系统主要包括建筑供水节水子系统、中水处理与回用子系统、雨水收集与利用子系统、景观水体水质保障 等子系统。<br>   ②绿色建筑节水与水资源利用系统全过程整合设计研究及实践结果表明:整合设计应贯穿项目规划、方案设计到施工图设计整个过程,在项目规划阶段 ,应有节水与水资源利用的专业人员介入,综合考虑地区资源与气象条件、建筑类型、建筑*面布局、当地经济发展水*等各方面因素,提出绿色建筑 节水与水资源利用初步方案并与其他专业研讨技术交叉和整合研讨,在后续的初步设计及施工图设*锥危枳酆辖ㄖ⒐婊⒕肮邸⒔峁埂⒔ㄖ谀 、建筑给排水、建筑电气、自动化控制等各个专业,使各工种有机整合,密切协作,深入分析建筑自身特点及区域自然资源、环境,根据项目实际需求 ,形成一整套可行的、因地制宜的、内部有机相连的绿色建筑节水与水资源利用系统方案与实施措施。<br>   ③绿色建筑节水与水资源利用系统方案整合设计技术研究及实践结果表明:系统方案整合设计的核心内容包括绿色建筑(小区)设计条件分析、用排水量 计算与水量*衡分析、绿色建筑节水与水资源利用各子系统的方案设计。通过绿色建筑节水与水资源利用系统方案整合设计技术在我国南方某“双百示 范工程”实施结果表明,采用了经济适用、因地制宜的方案整合设计后,该示范工程项目节约年市政供水量为118883m3,节水率为25.2%,超过了《绿 色建筑评价标准二》控制项8%的要求;设计非传统水源使用量为75374m3,非传统水源利用率为17.62%,超过了《绿色建筑评价标准》一般项中非传统 水源利用10%的要求。<br>   ④绿色建筑节水与水资源利用系统施工图整合设计技术研究及实践结果表明:施工图整合设计的核心内容包括方案阶段收集的基础资料的补充和完善、 各子系统的施工图设计与整合。绿色建筑节水与水资源利用系统施工图整合设计在我国西南某高校“节能省地型建筑”示范工程中实施,示范项目用地 22.68万m2,建筑面积21.44万m2,节水率32.23%,非传统水源利用率26.86%。在中水收集与处理子系统方面,完成了中水收集管网及其中水处理站的 施工图设计:在雨水收集与利用子系统方面,根据方案设计并充分结合建筑周边设施,完成了卵石沟、沉砂检查井、雨水人工湿地处理池等雨水收集与 利用系统的施工图设计;在景观水体水质保障子系统设计方面,完成了人工湖的生态设计与水质保障设施施工图设计。<br>   本论文的研究成果,将为绿色建筑节水与水资源利用系统优化设计提供技术支撑,为建筑给排水工程师进行绿色建筑节水与水资源利用系统的设计提供 参考,具有重要的现实意义。

6.期刊论文 师前进.何强.柴宏祥.Shi Qianjin.He Qiang.Chai Hongxiang 绿色建筑住宅小区节水与水资源利用设 计探讨 -给水排水2008,34(1)
通过对某绿色建筑住宅小区的节水与水资源利用设计,采用了建筑中水处理与回用、雨水收集与利用、景观水体水质安全保障等设计措施,使该小区 直接节水率达到26%,非传统水源利用率达到37.2%.同时对节水与水资源利用项目产生的增量成本进行经济可行性论证.

7.期刊论文 朱颖珊 浅谈绿色社区的节水技术 -科技资讯2010(21)
作为一个建筑的新概念--绿色建筑的使用功能与其对环境的影响,与实行可持续发展战略中,水资源是一个很重要的因素.本文结合我国绿色建筑的评 价指标,从节水产品的普及、中水处理及回用,雨水利用和再生水源的开发,这四个方面,分析其主要存在的问题, 并与国外相关的技术措施对比,提出了我 国未来绿色居住社区节水的发展方向.

8.会议论文 万杰.杨婧.何万春 绿色建筑节水与水资源利用系统设计 2010
在水体污染日益严重,水资源逐渐短缺的今天,绿色建筑节水与水资源合理利用已成为当前国内研究的重要课题。结合南方地区某“双百示范工程 ”,介绍了该工程的建筑供水节水子系统、中水处理与回用子系统、雨水收集利用子系统、景观水体水质保障子系统的方案设计。该技术方案对于绿色 建筑合理利用水资源,能起到很好的节水效能。

9.会议论文 赵虹.雷鸣.邓建*.黄楚权 绿色建筑概念在大型超市排水设计中的应用 2008
通过多家大型超市的建筑给水排水设计在生活用水量的计算、生活热水的特殊加热方式、雨水的回渗、回收、利用及中水处理回用等方面做到保护 环境、节约能源,创造健康安全、适用和经济的活动空间,充分体现绿色建筑概念.

10.期刊论文 何强.柴宏祥.张丽.He Qiang.Chai Hongxiang.Zhang Li 绿色建筑中水处理工艺及设施探讨 -给水排 水2007,33(7)
通过对不同用途的绿色建筑中水水质标准的比较分析,参考《建筑中水设计规范》(GB 50036-2002)在绿色建筑中的应用特点,提出了适合绿色建筑的

中水处理工艺.并根据中水用途分别推荐适合绿色建筑的中水处理工艺,同时分析了环境景观水回用的中水池和消毒设施的应用特点.

引证文献(1条) 1.尹振娟.杨扬.卢建.陈纯兴.戴玉女 生物法-人工湿地组合工艺对小城镇混合污水氮素去除效果研究[期刊论文]生态环境学报 2010(5)

本文链接:http://d.wanfangdata.com.cn/Periodical_cqjzdxxb200906019.aspx 授权使用:万方100元会员卡(WFFOH31543),授权号:99a14d19-c2c6-4287-b35a-9ee100ec4ab3 下载时间:2011年5月12日


相关推荐

最新更新

猜你喜欢